Blackpool & Fylde Electrical Services Ltd logo

EICR Cost: What Affects the Price of an Electrical Inspection

Last updated 21 November 2026

The cost of an EICR, often called an EICR certificate or electrical safety certificate, depends mainly on how many circuits the property has, the age and condition of the consumer unit, whether earlier certificates exist, how easy it is to reach the wiring and what sort of property it is. Any remedial work found during the inspection is priced separately. We quote each EICR individually, and quotations are free.

There is no single fixed price for an Electrical Installation Condition Report, because the time an inspection takes depends on the property in front of the electrician. This guide explains what actually drives the cost of an EICR, what you receive for your money and how to compare quotations fairly. It is written for homeowners and landlords in Blackpool, the Fylde and Preston, and it applies to properties in England.

Why EICR prices vary

An EICR is mostly skilled time. The electrician has to isolate circuits, open up a sample of accessories, carry out a series of tests on every circuit and then write up the findings. Anything that adds time to those steps adds to the price. The main factors are set out below.

The number of circuits

Testing is carried out circuit by circuit, so the number of circuits matters more than the number of bedrooms. A small flat might have only a few circuits, while a larger house with an electric shower, a cooker, an immersion heater, an EV charger and a supply to a garage will have many more. Each extra circuit means more measurements to take, check and record.

The consumer unit

The consumer unit, often called the fuse board, is where every circuit starts, so its condition shapes the whole visit. A modern board with clear labelling and RCD protection is quicker to work through. An older board with rewireable fuses, no labels or a mixture of devices takes longer to identify and test, and it is more likely to lead to observations on the report. If you are already thinking about replacing an old board, our consumer unit upgrade guide explains what that involves.

Previous records and sampling

When there is an earlier certificate or condition report, the electrician can use it to plan the visit and agree a sensible level of sampling. On our EICR page we explain that we typically check 20% of each circuit. Where there is no earlier documentation, every outlet and termination has to be inspected, which takes longer and is one of the most common reasons a quotation is higher than people expect.

Access and limitations

Lofts that cannot be entered, fitted furniture in front of sockets, boarded floors and locked outbuildings all slow an inspection down or restrict what can be checked. Anything that cannot be inspected is recorded on the report as a limitation. Clearing access to the consumer unit, the loft hatch and the main sockets before the visit helps the electrician cover more of the installation in the time booked.

The type of property

Commercial and industrial premises usually have more circuits, three phase supplies and specialist equipment, so they are quoted differently from homes. Our commercial electrician page covers EICRs and compliance testing for businesses.

Remedial work is priced separately

The inspection and any repairs are two separate things. The price of an EICR covers inspecting, testing and reporting. If the report records items that need putting right, such as damaged accessories, missing protection or a poor earth connection, that remedial work is quoted on top. Where a C1 danger is found, the electrician should, with your agreement, make it safe before leaving, but a permanent repair is still a separate job.

When the repairs are complete, you should receive a Minor Electrical Installation Works Certificate or an Electrical Installation Certificate, depending on the work. Our Part P and electrical certificates guide explains which document applies to which job.

What the report includes

A completed EICR is more than a pass or fail. It should include:

  • details of the installation, including the type of supply and the earthing arrangement;
  • the extent of the inspection and any limitations, such as areas that could not be reached;
  • a schedule of inspections and a schedule of test results for each circuit;
  • a list of observations, each with a classification code;
  • an overall assessment of the installation as satisfactory or unsatisfactory for continued use;
  • a recommended date for the next inspection.

We provide the report electronically, with photographs of any issues found, so you can see exactly what each observation refers to.

The codes in plain terms

Every observation on the report is given one of four codes:

  • C1, danger present. Someone could be hurt now, and immediate action is needed.
  • C2, potentially dangerous. Not dangerous at this moment, but it could become dangerous if something else went wrong, so urgent remedial action is needed.
  • C3, improvement recommended. Not dangerous, but the installation would be better if it were improved.
  • FI, further investigation required. Something needs looking into more closely before it can be classified, and this should happen without delay.

Any C1 or C2 makes the overall result unsatisfactory. For a closer look at how codes are decided and which findings typically get each one, read can you fail an EICR?

How often you need one

How often an EICR is needed depends on how the property is used. Private landlords in England must have the installation inspected and tested at least every five years, or sooner if the previous report says so. For a home you own and live in there is no legal requirement, but Electrical Safety First recommends an inspection at least every 10 years, and it is sensible to have one when you buy a property or before major renovation work. Businesses must keep their electrical systems safe under the Electricity at Work Regulations 1989, and regular inspection is the usual way to show that.

Landlords and homeowners

Landlords

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, a private landlord must have a qualified person inspect and test the installation at least every five years, give copies of the report to tenants and complete any remedial or further investigation work within 28 days, or sooner if the report says so. Written confirmation that the work has been done then goes to the tenant and the local housing authority. Because those deadlines are fixed, it makes sense to plan for possible remedial work at the same time as booking the inspection. Our guide to electrical safety for landlords covers the wider duties.

Homeowners

For a homeowner, the report is expert advice rather than a legal requirement, and you decide what to act on. Many buyers also arrange an EICR before completing a purchase, so that they know what they are taking on and can plan for any repairs. If you need help with repairs or upgrades after an inspection, see our domestic electrical services.

How to compare quotations

When comparing prices, check what each quotation actually covers. Ask whether it includes every circuit, what level of sampling is planned, whether outbuildings and outdoor circuits are included and how the report will be delivered. A quotation that looks cheaper may cover less of the installation or leave more of it recorded as limitations. It is also worth checking that the electrician is registered with a recognised scheme. Our guide to choosing a registered electrician explains how.

Get a quotation for your EICR

We do not publish a fixed price, because every installation is different and we would rather quote for your property than give a figure that does not fit it. Tell us the type of property, roughly how many rooms it has, whether there is an earlier certificate and whether it is let, and we will give you a free quotation. Call 01253 364101 or send us a message.

Frequently asked questions

How much does an EICR cost?

We price each EICR individually, because the time it takes depends on the number of circuits, the consumer unit, access and whether earlier records exist. Contact us with a few details about the property for a free quotation.

How long does an EICR take?

It depends on the size of the property and the number of circuits. A small flat with earlier records is quicker than a large house with no paperwork, where every outlet has to be inspected. We will give you an idea of the time needed when we quote.

Does the price of an EICR include repairs?

No. The EICR covers inspecting, testing and reporting. Any remedial work found is quoted separately, and you can choose who carries it out.

Is an EICR the same as an electrical safety certificate?

For an existing installation, yes. People often call an EICR an electrical safety certificate, especially in rented property. New work is recorded on an Electrical Installation Certificate or a Minor Works Certificate instead.

Do landlords need a new EICR for every new tenant?

Not necessarily. A report is needed before a new tenancy starts and at least every five years. If the current report is still within its recommended interval, a copy is given to the new tenant before they move in.

How much is an EICR certificate for a landlord?

A landlord EICR is priced in the same way as any other: by the number of circuits, the consumer unit, previous records and access. Landlords may also want to plan for any remedial work, which must be completed within 28 days or sooner if the report says so. We give free quotations.

Why does an EICR certificate cost more for some properties?

The main reasons are more circuits, an older consumer unit, difficult access and no earlier paperwork. Where there are no previous records, every outlet and termination has to be inspected rather than a sample, which takes longer.

Is an EICR cheaper for a flat than a house?

Often, because a flat usually has fewer circuits, but not always. The price reflects the installation rather than the type of property, so a large flat with many circuits can take longer than a small house.

Sources

Call nowGet a quote