Can You Fail an EICR? C1, C2, C3 and FI Codes Explained
Last reviewed November 2026
People often ask whether their electrics passed or failed. Strictly speaking, an Electrical Installation Condition Report does not use those words. It ends with an overall assessment of the installation as either satisfactory or unsatisfactory for continued use, and in everyday terms an unsatisfactory report is a fail. This guide explains exactly what tips a report into unsatisfactory, what does not, what happens next and what landlords in England must do about it. If you want the basics of what an EICR is and how often you need one, start with our EICR guide for homeowners and landlords.
What decides the overall result
Each defect the inspector finds is written up as an observation and given a classification code. The overall result follows from those codes, not from the inspector's general impression of the property:
- C1, danger present. Someone could be hurt now. Any C1 makes the report unsatisfactory.
- C2, potentially dangerous. Not an immediate danger, but it would become one if a further fault or event occurred. Any C2 makes the report unsatisfactory.
- C3, improvement recommended. Not dangerous, but the installation would be safer if it were improved. A report with only C3 observations can still be satisfactory.
- FI, further investigation. The inspector found a possible problem that could not be classified without looking into it further. GOV.UK describes it as further investigation required without delay.
Electrical Safety First's Best Practice Guide 4, which the industry and GOV.UK both point to for coding, says that if there are no C1 or C2 observations it would not be reasonable to describe the installation as unsatisfactory. The same guide expects FI to be rare in a home, because an inspector should normally be able to put a code on what they find. Treat an FI as a question that still needs an answer. For a landlord, getting that answer is a legal requirement, as explained below.
Examples of what gets which code
Best Practice Guide 4 includes a long table of examples, and inspectors are expected to follow it or justify why they have not. A few typical entries show where the lines fall.
Typical C1 findings
- a badly damaged socket, switch or fitting with live parts that can be touched;
- cables with missing or damaged insulation leaving live conductors exposed;
- terminations or connections with no barrier or enclosure, so live parts can be reached;
- metalwork that has become live because of a fault;
- incorrect polarity at the origin of the installation.
Typical C2 findings
- no reliable means of earthing, or a gas, oil or water pipe being used as the earth;
- no effective main protective bonding to the incoming gas or water pipes;
- no earth at a socket-outlet;
- no RCD protection for sockets that could reasonably be used to power equipment outdoors, or for a socket in a room with a bath or shower;
- a main RCD that does not trip when tested;
- loose connections showing signs of overheating, or conductors clamped on their insulation in a terminal.
Typical C3 findings
- no RCD protection on socket circuits that are unlikely to be used outdoors and do not serve a bathroom;
- no RCD protection on lighting circuits;
- cables buried less than 50 mm deep in a wall without RCD protection;
- a Type AC RCD where a Type A is now required;
- a plastic consumer unit under a wooden staircase or on the only escape route, without a non-combustible enclosure;
- circuits not identified at the consumer unit;
- no AFDDs in an HMO, a high rise residential building, student accommodation or a care home.
Things that are not coded at all
Some points are recorded as observations only. Examples include a consumer unit that is mounted high but still reachable, combustible items stored close to the meter or consumer unit, no AFDDs in an ordinary home, and the absence of smoke or heat alarms. Alarms in rented homes are covered by separate rules, which our smoke and heat alarm guide explains.
Common myths about failing
- An old fuse box is an automatic fail. Age alone is not a code. What matters is what the board lacks. With no RCD protection at all, sockets that could feed equipment outdoors will usually attract a C2, which is why many older boards do end in an unsatisfactory report, but the reason is the missing protection rather than the date.
- A plastic consumer unit fails. It is only coded, as a C3, when it sits under a wooden staircase or on the only way out of the property. Elsewhere it is not a defect at all.
- Anything that does not meet the latest edition is a fail. The report compares the installation with the current BS 7671, but a departure is only coded C1 or C2 when it creates danger or potential danger. Many departures are C3 or have no code.
- No AFDDs means a fail. As shown above, the worst a missing AFDD attracts is a C3.
Limitations, and why they matter
Every report should say what was inspected and what was not, for example rooms that could not be entered, a loft that was not accessed or circuits that could not be switched off. Best Practice Guide 4 points out that the more limitations there are, the less the report is worth. A satisfactory result with heavy limitations tells you much less than it seems to, so read that section as carefully as the codes.
What happens after an unsatisfactory report
- Immediate dangers are made safe. Where there is a C1, the inspector should, with your agreement, make the danger safe before leaving, for example by isolating a circuit or fitting a temporary barrier. The C1 still appears on the report until a permanent repair is made.
- You get a list of what needs doing. Ask for the remedial work to be set out observation by observation, so you can see which items are C1, C2 and FI and which are optional C3 improvements.
- You choose who does the work. You do not have to use the company that carried out the inspection, although it already knows the installation. Whoever you choose should be competent and should certify what they do.
- The work is certified. Small repairs are normally recorded on a Minor Electrical Installation Works Certificate, while a new circuit or consumer unit gets an Electrical Installation Certificate. GOV.UK lists either of these, or a new satisfactory EICR, as acceptable written confirmation that the remedial work is done.
- Keep the paperwork together. File the original report with the certificates for the repairs. Together they show that each unsatisfactory item was dealt with.
If you think a code is wrong, ask the inspector to explain it and which example in Best Practice Guide 4 it matches. A good inspector will be happy to do that. If you are still unsure, a second opinion from another registered electrician is reasonable, but be wary of anyone offering to change codes without testing the installation.
Landlords: what the law requires after a fail
For private landlords in England, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 turn an unsatisfactory report into a set of deadlines. The regulations were extended to social housing from November 2025, with social tenancies granted before December 2025 brought in from May 2026.
Where the report says remedial work or further investigation is needed, which in practice means any C1, C2 or FI, the landlord must:
- have the work carried out within 28 days of the inspection, or within any shorter period the report specifies;
- obtain written confirmation from the qualified person who did the work;
- send that confirmation, with the report, to the tenant and to the local council within 28 days of the work being finished.
C3 items do not have to be fixed to comply, although GOV.UK notes that acting on them would improve safety.
If the work genuinely cannot be finished in 28 days, for example because the energy supplier has to fit an isolator before a consumer unit can be changed, or the tenant cannot give access, GOV.UK guidance says a landlord is not in breach if they can show they took all reasonable steps. In practice that means keeping a record of every attempt to book the work, every message to the tenant and every conversation with the supplier.
Councils enforce the rules. Where a landlord is in breach, the council can serve a remedial notice, can arrange urgent work itself where the report shows it is needed and recover the cost, and can impose a financial penalty, which GOV.UK currently puts at up to £40,000. Tenants may also have rights under the Homes (Fitness for Human Habitation) Act 2018. For a landlord's wider electrical duties, see our electrical safety for landlords guide.
Typical remedial work
Most unsatisfactory reports are put right with fairly ordinary electrical work. Common jobs include:
- replacing damaged sockets, switches, ceiling roses and light fittings;
- remaking loose or overheated connections and replacing damaged cable;
- fitting or upgrading main protective bonding to the gas and water pipes;
- correcting earthing problems, or asking the network operator to look at the supply earth;
- adding RCD protection, which on an older installation often means replacing the consumer unit;
- replacing RCDs that fail to trip when tested;
- correcting polarity faults and labelling circuits properly.
Where RCD protection is the issue, it is worth deciding at that point whether you want RCDs, RCBOs or AFDDs, because changing the board twice costs more than getting it right once. Our guide RCD vs RCBO vs AFDD compares the options.
Making a fail less likely next time
A few habits help: press the RCD test buttons as the manufacturer recommends, replace cracked or scorched accessories as soon as you notice them, do not let anyone carry out DIY work on the fixed wiring, keep the area around the consumer unit clear, and keep the certificate for every job so the next inspector can see what has changed.
Book an inspection or remedial work
We carry out EICRs and the remedial work that follows across Blackpool, the Fylde, Preston, Kirkham, Garstang, Over Wyre and Fleetwood. See our EICR service for more about inspections, or use our contact page to arrange one or to ask about a report you have already had. You can also call 01253 364101.
Frequently asked questions
Can a house fail an EICR just because it is old?
No. Age is not a classification code. A report is only unsatisfactory if it contains at least one C1 or C2 observation, although older installations are more likely to have them, often because of missing RCD protection or earthing problems.
Does a C3 mean my EICR has failed?
No. A C3 means improvement is recommended. A report with only C3 observations can be satisfactory, and landlords are not legally required to fix C3 items.
Does an FI code make the report unsatisfactory?
Industry guidance says the overall result is decided by C1 and C2 codes, but an FI still needs investigating without delay. Landlords in England must have FI items investigated within 28 days, or sooner if the report says so.
Do I need a whole new EICR after the repairs?
Not necessarily. Remedial work is usually confirmed with a Minor Electrical Installation Works Certificate or an Electrical Installation Certificate. GOV.UK accepts either of these, or a new satisfactory EICR, as written confirmation for landlords.
What happens if a landlord does not fix C1 or C2 items?
The local council can serve a remedial notice, arrange urgent work and recover the cost, and impose a financial penalty of up to £40,000.
Can the electrician fix a C1 on the day?
They should make it safe before leaving, with your agreement, for example by isolating the circuit. A permanent repair may need a separate visit, and the C1 stays on the report until it is done.
Sources
- Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (SI 2020/312)https://www.legislation.gov.uk/uksi/2020/312/contents
- GOV.UK, Electrical safety standards in the private and social rented sectors: guidancehttps://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance
- Electrical Safety First, Best Practice Guide 4: Electrical Installation Condition Reportinghttps://niceic.com/getmedia/1acf8e45-b5a1-40ed-b066-d5f18674f99e/best-practice-guide-4-issue-7.pdf