Workplace EV Charging: A Guide for Businesses
Last reviewed November 2026
Installing EV chargers at a workplace means planning for the number of vehicles, how long they park, the capacity of the building's electricity supply and the business's legal duties for electrical safety. Most workplaces use AC chargers rated at 7kW, 11kW or 22kW, often with load management so several chargers share the available capacity. The installation must follow BS 7671, be tested and certified, and be maintained under the Electricity at Work Regulations 1989.
This guide explains the main decisions in plain English.
Who will use the chargers?
Start with the users, because this shapes everything else:
- Staff usually park for most of the working day, so moderate rate chargers are often enough.
- Fleet or pool vehicles may need to turn around quickly, which can justify higher rated chargers.
- Visitors and customers may stay for a short time and may need to pay or authorise a session.
Count how many vehicles need to charge now and how many might in future. Installing extra cable routes or ducts during the first project can make later expansion easier.
Charger types for workplaces
Most workplace chargers are AC wallboxes or pedestals. Their power depends on the supply: three phase supplies, common in commercial buildings, allow 11kW or 22kW chargers. The car's onboard charger also limits speed, so check the vehicles you expect. Our 7kW vs 22kW guide explains this. DC rapid chargers need much larger supplies and are a separate kind of project.
Supply capacity and load management
The building's supply has a fixed capacity, and existing loads such as heating, machinery and lighting all use part of it. A qualified electrician will assess maximum demand and available capacity. Load management systems can share capacity between chargers so they do not overload the supply, and can prioritise particular vehicles. If more capacity is needed, the network operator may need to be involved, which can take time. See our guide to EV chargers, main fuses and load management.
Location and layout
Think about:
- Which bays will have chargers and how cables or ducts reach them
- Protection from vehicle impact, such as bollards or wheel stops
- Accessible bays and reach for disabled drivers
- Lighting and signage around the bays
- Data connection for smart features and billing
Earthing and protection
Outdoor chargers need the earthing arrangement assessed, and PME supplies have specific requirements under BS 7671. Our EV charger earthing and PME guide explains why. Each charger needs suitable RCD protection and the installation must be tested and certified.
Legal duties for businesses
Employers and people in control of premises have duties under the Electricity at Work Regulations 1989 to keep electrical systems safe and maintained. That includes chargers. A planned approach to inspection and testing, including fixed wire testing, helps show those duties are being met. The fire risk assessment for the premises should also consider the chargers and parking area.
Smart functions, payment and access
Workplace chargers can be set up so only authorised users can charge, or so users pay per session. Some systems report energy use per vehicle, which can help with internal recharging of costs. Consider who will manage the back office software and support users.
Grants
Government grants for workplace chargers have their own eligibility rules, which change. Check the official GOV.UK chargepoint grants page for current details before planning around any grant. Our EV charger grant guide explains grants in general terms.
Maintenance
Chargers are used heavily and are exposed to weather and vehicles. Plan for regular visual checks, cleaning, software updates and periodic inspection and testing. Damaged cables or connectors should be taken out of use until repaired. Our commercial electrical maintenance guide covers planned maintenance more generally.
A simple planning checklist
- Agree who will use the chargers and how long they park.
- Count vehicles now and in a few years.
- Ask for a supply capacity and maximum demand assessment.
- Choose locations with impact protection and accessible bays.
- Decide on access control, payment and software.
- Plan inspection, testing and maintenance from day one.
Communicating with staff
Clear rules help chargers work well for everyone. Decide whether bays are for charging only, how long vehicles can stay connected, whether staff pay for energy and who to contact if a charger is faulty. Put simple instructions near the bays and in staff handbooks. Monitoring use over the first few months can show whether more chargers are needed, or whether a booking system or time limits would make better use of the ones you have. Feedback from drivers is also a useful early warning of problems with cables, connectors or software.
Next steps
You can read about our commercial work on our commercial electrical page and our EV work on the EV charger installer page. To discuss chargers for your premises, contact us to arrange a site survey and quotation.
Common mistakes to avoid
Businesses sometimes install the cheapest number of chargers without thinking about growth, then find that adding more means digging up the car park again. Others forget about data connections, so smart features and billing never work properly. Some overlook the supply until late in the project, which delays everything while the network operator reviews capacity. A survey at the start, covering supply, layout, earthing and future plans, avoids most of these problems.
Keeping records
Keep the Electrical Installation Certificate, commissioning records, manufacturer documents and maintenance logs together. These records help you manage the chargers, deal with warranty claims and show that you are meeting your duties for electrical safety. They are also useful if the site changes hands or when chargers are added later.
Frequently asked questions
What size chargers do workplaces use?
Most use AC chargers rated at 7kW, 11kW or 22kW, depending on the supply, how long vehicles park and what the vehicles can accept.
Can several chargers share one supply?
Yes. Load management systems share the available capacity between chargers so the supply is not overloaded.
Do workplace chargers need maintenance?
Yes. Businesses have duties under the Electricity at Work Regulations 1989 to keep electrical systems safe, so chargers need regular checks, testing and maintenance.
Are there grants for workplace chargers?
There may be, but eligibility rules change. Check the official GOV.UK chargepoint grants page for current information.
Can we restrict who uses the chargers?
Many workplace chargers support access control and payment through cards or apps, so only authorised users can charge.
Sources
- GOV.UK, Electric vehicle chargepoint grantshttps://www.gov.uk/guidance/electric-vehicle-chargepoint-grants
- Electricity at Work Regulations 1989https://www.legislation.gov.uk/uksi/1989/635/contents
- HSE, Electrical safety at workhttps://www.hse.gov.uk/electricity/